<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"><channel><title>Heavy Equipment Movers blog</title><link>https://heavy-equipment-movers.pages.dev/blog/</link><description>Heavy equipment moving across the UK: machinery relocation, plant and industrial kit moved, lifted and positioned by an experienced rigging team with planned lifts and the right equipment.</description><language>en-gb</language><item><title>How to move a heavy safe: weights, methods and typical UK costs</title><link>https://heavy-equipment-movers.pages.dev/blog/how-to-move-a-heavy-safe/</link><guid>https://heavy-equipment-movers.pages.dev/blog/how-to-move-a-heavy-safe/</guid><description>A heavy safe is moved by assessing its weight, the route and the floor, then using a pallet truck, machine skates, a powered stair climber or a lorry-mounted crane depending on where it has to go. Small home fire safes can often be moved by two people with a sack truck, but anything over about 150 kg, or any safe going up or down stairs, should be handled by a specialist. A typical ground-floor local move usually costs £250 to £600, with stairs, basements and crane lifts costing more.</description><category>How-to</category><pubDate>Fri, 06 Nov 2026 09:00:00 +0000</pubDate></item><item><title>Can my floor take a heavy machine? UK floor loading explained</title><link>https://heavy-equipment-movers.pages.dev/blog/can-my-floor-take-a-heavy-machine/</link><guid>https://heavy-equipment-movers.pages.dev/blog/can-my-floor-take-a-heavy-machine/</guid><description>Whether a floor can take a heavy machine depends on what the floor was designed for, the machine&#x27;s total weight and how that weight is spread through its feet. UK office floors are typically designed for around 2.5 to 3 kN per square metre and domestic floors around 1.5 kN per square metre, so heavy machines on upper floors or mezzanines nearly always need a structural engineer&#x27;s check. Ground-bearing industrial slabs usually cope better but can still crack under concentrated point loads.</description><category>Advice</category><pubDate>Fri, 06 Nov 2026 09:00:00 +0000</pubDate></item><item><title>Moving machinery into a basement or upper floor: your options</title><link>https://heavy-equipment-movers.pages.dev/blog/moving-machinery-into-a-basement-or-upper-floor/</link><guid>https://heavy-equipment-movers.pages.dev/blog/moving-machinery-into-a-basement-or-upper-floor/</guid><description>Heavy machinery is moved into basements and upper floors using a goods lift if it is rated for the load, a powered stair climber for lighter items, a gantry or chain block through a hatch, or a HIAB or crane lift through a removed window, roof or wall panel. The right method depends on the weight, the dimensions, the access and the floor at the final position. Many jobs also involve partly dismantling the machine to get it through.</description><category>How-to</category><pubDate>Fri, 06 Nov 2026 09:00:00 +0000</pubDate></item><item><title>Crane lift permits UK: highway licences, road closures and oversailing</title><link>https://heavy-equipment-movers.pages.dev/blog/crane-lift-permits-road-closures-oversailing/</link><guid>https://heavy-equipment-movers.pages.dev/blog/crane-lift-permits-road-closures-oversailing/</guid><description>If a crane or HIAB lorry will stand on, lift from or swing a load over the public highway, you usually need a crane or oversail licence from the local highway authority. Councils typically ask for at least 7 to 10 working days&#x27; notice, and several weeks if a road closure or traffic order is needed. Swinging a load or jib over a neighbour&#x27;s land without consent can be a trespass, so written agreement is usually needed too.</description><category>Regulations</category><pubDate>Fri, 06 Nov 2026 09:00:00 +0000</pubDate></item><item><title>Moving a standby generator: weights, fuel and reconnection</title><link>https://heavy-equipment-movers.pages.dev/blog/moving-a-standby-generator-safely/</link><guid>https://heavy-equipment-movers.pages.dev/blog/moving-a-standby-generator-safely/</guid><description>To move a standby generator, have it isolated and disconnected by a competent electrician, reduce fuel to the level your mover advises, secure the batteries and fluids, then lift it only from its designed lifting points by forklift, HIAB or crane. At the new site it needs a level, adequate base, safe exhaust routing, reconnection by an electrician and a load test before you rely on it.</description><category>How-to</category><pubDate>Fri, 06 Nov 2026 09:00:00 +0000</pubDate></item><item><title>Selling or scrapping old machinery: UK rules, value and removal</title><link>https://heavy-equipment-movers.pages.dev/blog/selling-or-scrapping-old-machinery/</link><guid>https://heavy-equipment-movers.pages.dev/blog/selling-or-scrapping-old-machinery/</guid><description>Redundant machinery can be sold to a dealer, auctioned, sold privately, or recycled as scrap metal. If you sell machinery for use at work, you still have duties to supply it in a safe condition with any instructions you have. Scrap dealers in England and Wales cannot pay cash for scrap metal, and removal costs often decide whether resale or scrap makes more sense.</description><category>Business</category><pubDate>Fri, 06 Nov 2026 09:00:00 +0000</pubDate></item><item><title>10 machinery moving mistakes that cause damage, delays and downtime</title><link>https://heavy-equipment-movers.pages.dev/blog/machinery-moving-mistakes-to-avoid/</link><guid>https://heavy-equipment-movers.pages.dev/blog/machinery-moving-mistakes-to-avoid/</guid><description>The most common machinery moving mistakes are guessing weights, not surveying the route, booking trades on the wrong days, forgetting fluids and loose parts, skipping lift plans, and not preparing the new floor and services. Most problems come from planning gaps rather than the lift itself, so a survey, a written method statement and a clear list of who does what prevent most damage and delays.</description><category>Advice</category><pubDate>Fri, 06 Nov 2026 09:00:00 +0000</pubDate></item><item><title>Best time to move machinery: shutdowns, bank holidays and weather</title><link>https://heavy-equipment-movers.pages.dev/blog/best-time-to-move-machinery-shutdown-periods/</link><guid>https://heavy-equipment-movers.pages.dev/blog/best-time-to-move-machinery-shutdown-periods/</guid><description>Most UK businesses move machinery during planned shutdowns, such as the Christmas and New Year break, a summer shutdown or a long bank holiday weekend, because production is already stopped. These periods are popular, so riggers, cranes and engineers should be booked months ahead. Weekend and evening work is common but can cost more, and winter weather and short days need extra planning.</description><category>Seasonal</category><pubDate>Fri, 06 Nov 2026 09:00:00 +0000</pubDate></item><item><title>Leaving an industrial unit: machinery removal and dilapidations</title><link>https://heavy-equipment-movers.pages.dev/blog/leaving-an-industrial-unit-machinery-and-dilapidations/</link><guid>https://heavy-equipment-movers.pages.dev/blog/leaving-an-industrial-unit-machinery-and-dilapidations/</guid><description>When you leave a leased industrial unit, you usually need to remove your machinery and fixings and return the unit to the condition the lease requires, which can include filling anchor holes, removing plinths and repairing floors. If you do not, the landlord can bring a dilapidations claim for the cost. Read the repair, reinstatement and yield-up clauses early, and plan machinery removal so the unit is clear before the lease end date.</description><category>Business</category><pubDate>Fri, 06 Nov 2026 09:00:00 +0000</pubDate></item><item><title>Moving a lathe or milling machine into a garage or home workshop</title><link>https://heavy-equipment-movers.pages.dev/blog/moving-a-lathe-or-mill-into-a-home-workshop/</link><guid>https://heavy-equipment-movers.pages.dev/blog/moving-a-lathe-or-mill-into-a-home-workshop/</guid><description>To move a lathe or mill into a garage or home workshop, find its true weight, strip off heavy removable parts, and move it on a pallet truck, skates or rollers with a rated engine crane or gantry to lift it, never by hand on its own legs. Small bench lathes can be a two-person job, but floor-standing lathes and knee mills often weigh 500 kg to over a tonne and are top-heavy, so a specialist with a tail-lift or HIAB vehicle is usually the safer choice.</description><category>Homeowners</category><pubDate>Fri, 06 Nov 2026 09:00:00 +0000</pubDate></item></channel></rss>
