Moving a whole site is a project rather than a single job. The aim is to move every machine, rack and bench into the right place in the new building, in an order that keeps the business supplying customers. That usually means building stock ahead of the move, moving production cells in phases, and reconnecting each machine before the next group moves, rather than emptying the old site in one go.
We work from your new floor plan, with every item numbered and its position marked on the new floor. Machines are surveyed, grouped by method and vehicle, and scheduled in a sequence agreed with your production team. Electricians, compressed air installers and machine suppliers are lined up so that services are ready at the new site and equipment is commissioned as soon as it lands, keeping downtime as short as possible.
What is included
- Survey of both sites and every machine to be moved
- Move schedule built around your production plan and stock build
- Numbered labelling of machines, racking and ancillaries against the new floor plan
- Phased moves by production cell or department
- Racking, workbenches, tooling cabinets and stock moved alongside machinery
- Evening and weekend working where it reduces downtime
- Coordination with electricians, air and services installers and machine suppliers
- Removal of redundant equipment for resale or recycling
Who it is for
- Manufacturers moving to a larger or more efficient unit
- Workshops whose lease is ending with a fixed handback date
- Businesses merging two sites into one
- Firms moving production between UK regions
- Companies that cannot afford a long production shutdown
How much does it cost?
As a guide, a small workshop relocation with several machines typically costs £2,000 to £8,000, and factory or production line relocations commonly start around £10,000 and are priced individually after a survey. See our full cost guide.